Bloomberg, London

Project comprised refurbishment works to the 6th and 7th floors of Bloomberg’s European Headquarters. Design and installation of perimeter, colour co-ordinated lighting to each floor, bespoke 3 lamp recessed floor and ceiling luminaire to the cloakrooms with differing coloured lamps, and blue LEDs to the underside of each stair stringer was also included.

In addition, meeting rooms to both floors featuring different lighting options from recessed mains and low voltage down lights through recessed up/down lights to batten luminaires with coloured sleeves were installed.

Lighting was also linked to the AV system, providing different types of scene setting when required.