General Motors, Luton

PON has been responsible for electrical and mechanical installations at this plant since the early 90s. Recent works include supplying power and lighting to General Motors’ new X82 body shop, home to a van production line including automotive welding robots.

Stripping out and isolating an old chassis assembly line as well as installing power and lighting to a new assembly line located within a different part of the factory was also included.

PON is also responsible for a diverse range of factory projects including implementation of fire alarm systems, controls, lighting, power, low voltage distribution including switch boards, panel boards, 2500A Busbar systems, substation and robot panel installation works.